Cost sheet
Preliminary estimate from layout quantities and material assumptions. Final pricing requires QS approval.
All updated
Estimate mode
Concept Estimate
Concept Estimate uses a built-up ratio of the site area for the selected project type. Detailed Estimate uses generated quantities directly. Final pricing requires supplier rates and QS review.
Estimated range
Low
QAR 126k
Expected
QAR 177k
High
QAR 227k
Range reflects built-up ratio band, not commitment.
Estimated total
QAR 176,861
Items
11
Built-up area
531 sqm
Last updated
4/25/2026
Cost by category
Derived from 11 line items
ArchitecturalQAR 86k · 48.4%
External WorksQAR 68k · 38.3%
Mechanical / MEPQAR 12k · 6.8%
ElectricalQAR 11k · 6.2%
Fire & SafetyQAR 600 · 0.3%
Top materials (object-derived)
3 shown
- Exterior blockwork / cladding20 · QAR 154k
- Aluminum window unit24 · QAR 28k
- Commercial internal door5 · QAR 4k
Confidence
Low 0Med 11High 0
Line items
| Item | Qty | Unit | Unit Cost | Total Cost | Source | Status |
|---|---|---|---|---|---|---|
| Standard flooring | 530.9 | sqm | QAR 47,781 | Demo default | Updated | |
| Internal partitions | 111.8 | m | QAR 22,360 | Demo default | Updated | |
| Internal doors | 5 | each | QAR 3,750 | Demo default | Updated | |
| Paint and finishing | 335.3 | sqm | QAR 11,736 | Demo default | Updated | |
| Electrical points | 22 | each | QAR 5,500 | Demo default | Updated | |
| Lighting points | 30 | each | QAR 5,400 | Demo default | Updated | |
| MEP / Electrical room allowance | 1 | zones | QAR 12,000 | Demo default | Updated | |
| Fire safety signage / points | 2 | each | QAR 600 | Demo default | Updated | |
| Service corridor finishes | 137.3 | sqm | QAR 19,222 | Demo default | Updated | |
| Parking surface | 200.6 | sqm | QAR 20,060 | Demo default | Updated | |
| Access road / surface | 237.1 | sqm | QAR 28,452 | Demo default | Updated |
Material parameters
RegionQatar
CurrencyQAR
Rate sourceDemo default
ConfidenceMedium
Last updated4/25/2026
Rates can be replaced with supplier quotes or live feeds in production.
Ask cost questions
What is the supplier rate for internal doors?
Should flooring use standard, commercial, or premium rate?
Is HVAC allowance included in this estimate?
Is this a shell/core estimate or fit-out estimate?
Answers are stored on the project and can be sent with the BOQ for QS review.